🏡 Pre & Post Construction
Both pre- and post-construction termite treatments are crucial for safeguarding wooden structures, flooring, and foundations. Pre-construction is carried out before the foundation or flooring is laid. It prevents termites from entering the building by creating a chemical barrier in the soil. Post-construction is applied to existing structures to eliminate active termite colonies and prevent further damage.
Pre & Post Construction Control :
Prevents costly damage to wooden structures, flooring, and furniture. Pre-construction treatment stops termites before they infest the property. Post-construction treatment removes termites that have already entered the building. Creates a barrier that prevents termite entry for years. Ensures your home or office remains structurally safe and termite-free.
🌿 Methods :
- Pre-Construction: Soil treatment before foundation work; termite-proof coating around structural joints.
 - Post-Construction: Drilling and injecting termiticide into walls, floors, and wooden structures; chemical barrier treatment around the perimeter.
 - Monitoring & Maintenance: Regular inspections ensure long-term protection.
 



